And wires he pulled! Over 400 feet of wire is in the basement right now. And not all is in yet.
You know what they say. Hope for the best, prepare for the worst. Because I know at one point. I might run out of power outlets.
The plan is to do all LEDs for the white work lights. The switches for the eight lights will be near the ceiling and will be per side. The safelights will live on one switch (normal height) right at the entrance.
No comments:
Post a Comment